ASL Olbia dialysis centre

ITALY - OLBIA

Project data

Year of construction: 2011
Area: 216 m2
Duration: 1 month

Ambito

Design, supply and installation of dialysis unit with Lindo® System.

 

12 cartridges of blue 2707-C silicone have been used. 

Gallery

2016 © Copyright - SHD ITALIA. All rights reserved.